Please see our updates regarding COVID 19 on: the current lock-down, how we are re-opening, the safety measures currently in place and how we are handling memberships.  RE-OPENING ON WEDNESDAY 2nd DECEMBER

Outdoor Spa Pool and Sauna Closure – For Maintenance

On Monday the 14th of October we will be starting work to the outdoor areas of the adult only pool hall.  The work will include maintenance to the Hydro Spa Pool (Replacing / Fixing Loose Tiles) and the construction of a small canopy to the immediate area on exiting the pool hall.  There is a small area, by the shower which needs covering over to protect the floor below from the winter elements to enable us to keep access to the lower Hydro Spa Pool areas open during freezing winter conditions.

The builders say work is expected to take 2 weeks but lets say 3 just to be on the safe-side?

We hope this does not inconvenience you all too much and thank you for your understanding whilst these works are undertaken.